Agua Hedionda Caulerpa Taxifolia Eradication Program
Map
|
Completed |
San Diego |
364.0 |
Alamitos Bay Oyster Restoration Project
Map
|
Completed |
Los Angeles |
< 0.1 |
Aliso Creek Estuary Restoration Plan
Map
|
Planning |
Orange |
6.00 |
Arroyo Burro Estuary and Mesa Creek Restoration
Dataset
Monitoring Report
Photo
Plan or Permit
Map
|
Completed |
Santa Barbara |
0.64 |
Arroyo Hondo Creek Steelhead Passage Enhancement
Map
|
Completed |
Santa Barbara |
< 0.1 |
Arroyo Hondo Ranch Acquisition
Map
|
Completed |
Santa Barbara |
800.0 |
Atascadero and Maria Ygnacio Steelhead Restoration Design
Map
|
Planning |
Santa Barbara |
1.62 |
Ballona Wetlands Acquisition
Map
|
Completed |
Los Angeles |
560.0 |
Ballona Wetlands Restoration Planning
Map
|
Planning |
Los Angeles |
600.0 |
Batiquitos Lagoon Mitsuuchi Acquisition
Map
|
Completed |
San Diego |
18.11 |
Big Canyon Creek Restoration and Estuary Adaptation Project
Map
|
Planning |
Orange |
18.70 |
Big Canyon Creek Restoration Plan
Map
|
Completed |
Orange |
45.00 |
Bitter Point Salt Marsh Acquisition
Map
|
Planning |
Orange |
3.00 |
Bolsa Chica Lowlands Sea Level Rise Adaptation Project
|
Planning |
Orange |
840.0 |
Bolsa Chica Wetlands Restoration
Monitoring Report
Map
|
Completed |
Orange |
566.0 |
Brookhurst Marsh Acquisition
Map
|
Completed |
Orange |
16.60 |
Buena Vista Audubon Society Wetlands Reserve Restoration Project: 60% Design and Engineering
|
Planning |
San Diego |
3.50 |
Buena Vista Creek Acquisition - Sherman Property
Map
|
Completed |
San Diego |
133.8 |
Buena Vista Creek Watershed Plan
Map
|
Completed |
San Diego |
< 0.1 |
Buena Vista Lagoon Enhancement Project: 65% Design and Engineering Plans
Map
|
Planning |
San Diego |
282.9 |
Buena Vista Lagoon Restoration Plan, Feasibility Analysis
|
Completed |
San Diego |
133.8 |
Carlsbad Hydrologic Unit Riparian Habitat Restoration
Map
|
Completed |
San Diego |
< 0.1 |
Carpinteria Creek Arundo Removal Project
Map
|
Completed |
Santa Barbara |
2.50 |
Carpinteria Salt Marsh, Basin 1 Enhancement Plan
Map
|
Completed |
Santa Barbara |
33.00 |
Carpinteria Salt Marsh, Basin 1 Implementation
Monitoring Report
Map
|
Completed |
Santa Barbara |
29.00 |
Coal Oil Point Reserve Coastal Access and Habitat Restoration
Map
|
In-progress |
Santa Barbara |
217.0 |
Cold Creek Enhancement Plan and Acquisition
Map
|
Completed |
Los Angeles |
71.50 |
Colorado Lagoon Restoration
Map
|
Completed |
Los Angeles |
15.00 |
Cottonwood Creek Park Riparian Restoration
Map
|
Completed |
San Diego |
2.40 |
Coyote Creek Watershed Plan
|
Completed |
Orange |
< 0.1 |
DeForest-Dominguez Gap Wetlands: Planning and Design
Map
|
Completed |
Los Angeles |
< 0.1 |
DeForest Wetlands Restoration
Map
|
Completed |
Los Angeles |
< 0.1 |
Devereux Slough/Ellwood Mesa Regional Plan
Map
|
Completed |
Santa Barbara |
< 0.1 |
Devereux Slough: Ocean Meadows Acquisition
Map
|
Completed |
Santa Barbara |
63.00 |
East Garden Grove Wintersburg Channel Treatment
Map
|
Completed |
Orange |
< 0.1 |
El Dorado Wetlands Restoration Plan
|
Completed |
El Dorado |
20.00 |
Escondido Creek Watershed Restoration Action Strategy
|
Completed |
San Diego |
< 0.1 |
Famosa Slough Culvert Extension and Retrofit Design
Map
|
Completed |
San Diego |
< 0.1 |
Fenton Properties Acquisition
|
Completed |
San Diego |
100.0 |
Goat Canyon Enhancement Project
|
Completed |
San Diego |
< 0.1 |
Goleta Slough Tidal Restoration
Map
|
Completed |
Santa Barbara |
2.00 |
Hanson Floodplain Restoration
Map
|
In-progress |
Ventura |
238.0 |
Hanson Pond Acquisition, El Monte Valley
Map
|
Completed |
San Diego |
143.5 |
Hazard Park Wetlands Restoration Concept Plan
Map
|
Completed |
Los Angeles |
5.00 |
Hedrick Ranch Nature Area Restoration Project
Map
|
Completed |
Ventura |
223.0 |
Huntington Beach Wetlands Restoration
Map
|
Completed |
Orange |
253.6 |
Las Flores Creek Restoration
Map
|
Completed |
Los Angeles |
215.2 |
Loma Alta Slough Wetlands Enhancement Project - Phase 2 Implementation
Map
|
Planning |
San Diego |
6.80 |
Los Angeles River Taylor Yard: Acquisition & Implementation Plan
Map
|
Planning |
Los Angeles |
42.60 |
Los Cerritos Wetlands Complex - Bryant Acquisition Phase 1 & 2
Map
|
Planning |
Los Angeles |
378.0 |
Los Cerritos Wetlands Southern Area Planning and Permitting
|
Planning |
Los Angeles |
105.0 |
Los Penasquitos Creek Sediment Management
Map
|
Completed |
San Diego |
3.00 |
Los Penasquitos Lagoon Restoration Design and Feasibility Study
Map
|
Planning |
San Diego |
23.00 |
Lower Refugio Creek Restoration
Map
|
Completed |
Santa Barbara |
4.00 |
Machado Lake Habitat Restoration Project
Map
|
Completed |
Los Angeles |
104.0 |
Malibu Creek Arundo Removal Project
Map
|
Completed |
Los Angeles |
100.0 |
Malibu Creek Steelhead Barrier Removal (Cross Creek Road)
Map
|
Completed |
Los Angeles |
1.00 |
Malibu Lagoon Restoration
Map
|
Completed |
Los Angeles |
31.00 |
Matilija Dam Ecosystem Restoration Program
Map
|
Planning |
Ventura |
9.22 |
Matilija Dam Removal Feasibility Study
Map
|
Completed |
Ventura |
< 0.1 |
McGrath State Beach – Wetlands Restoration and Campground Relocation
|
Planning |
Ventura |
30.00 |
Mission Creek Fish Passage Enhancement Project
Map
|
Completed |
Santa Barbara |
1.26 |
Mission Creek Museum Area Restoration Plan
Map
|
Completed |
Santa Barbara |
1.50 |
Newland Marsh Acquisition
Map
|
Completed |
Orange |
44.00 |
Newland Marsh Restoration Permitting and Design
|
Planning |
Orange |
44.80 |
Ormond Beach Edison Acquisition
Map
|
Completed |
Ventura |
260.0 |
Ormond Beach Wetlands: Acquisition, Part 2
Map
|
Planning |
Ventura |
561.0 |
Ormond Beach Wetlands Restoration Plan
Map
|
Planning |
Ventura |
1,100 |
Prisoners Wetland and Lower Canada del Puerto Restoration
Map
|
Completed |
Santa Barbara |
400.0 |
Randall Preserve Wetland Feasibility Study
|
Planning |
Orange |
385.5 |
Redondo Beach: Power Plant to Park Acquisition and Planning
Map
|
Planning |
Los Angeles |
30.29 |
Re-Wild Mission Bay Conceptual Plan
|
Completed |
San Diego |
170.0 |
Rio Hondo/Upper San Gabriel River Watershed Arundo Eradication Program
Map
|
In-progress |
Los Angeles |
45.00 |
San Diego Bay Native Oyster Living Shoreline
Map
|
Proposed |
San Diego |
< 0.1 |
San Diego Canyon Wetlands Restoration Project
Map
|
Planning |
San Diego |
1,717 |
San Diego County Marine Protected Area (MPA) Wetland Restoration Project
Map
|
In-progress |
San Diego |
41.90 |
San Diego River Land Conservation Program: Hanlon-Walker
Map
|
Completed |
San Diego |
105.0 |
San Dieguito Lagoon Wetland Acquisition
Map
|
Completed |
San Diego |
75.00 |
San Dieguito Watershed Invasive Species Control and Re-vegetation
Map
|
In-progress |
San Diego |
847.0 |
San Elijo Lagoon Restoration
Map
|
Completed |
San Diego |
960.0 |
San Joaquin Marsh Enhancement - Phase I
Map
|
Completed |
Orange |
50.00 |
San Joaquin Marsh Hydrology & Climate Adaptation Feasibility and Planning
Map
|
Planning |
Orange |
100.0 |
San Jose Creek Fish Passage Improvements - Dos Arroyos Ranch
Map
|
Completed |
Santa Barbara |
< 0.1 |
San Jose Fish Passage Project
Map
|
In-progress |
Santa Barbara |
1.03 |
San Juan Hydrologic Unit - Non-native Species Eradication Plan
Map
|
Completed |
Orange |
< 0.1 |
San Luis Rey River Arundo Removal and Habitat Restoration
Map
|
Completed |
San Diego |
35.52 |
Santa Barbara Urban Streams and Wetlands Restoration
|
Completed |
Santa Barbara |
< 0.1 |
Santa Clara River Riparian Restoration and Community Engagement for the Santa Paula-to-Sespe Conservation Area
Map
|
In-progress |
Ventura |
6,000 |
Santa Margarita River Fish Passage Project
Map
|
Completed |
San Diego |
15.00 |
Santa Monica Bay Watershed Acquisition
Map
|
Completed |
Los Angeles |
849.0 |
Seal Beach Sediment Augmentation Project
Map
|
In-progress |
Orange |
10.00 |
Serrano Creek Stabilization and Restoration
Map
|
Completed |
Orange |
< 0.1 |
Solstice Canyon Acquisition
|
Completed |
Los Angeles |
556.0 |
Solstice Creek Steelhead Access Implementation
Map
|
Completed |
Los Angeles |
< 0.1 |
South San Diego Bay Coastal Wetland Restoration Project
Map
|
Completed |
San Diego |
257.0 |
Summerland Greenwell Preserve Enhancement
Map
|
Completed |
Santa Barbara |
2.00 |
Tijuana Estuary Tidal Restoration Program: I & 2
Map
|
Planning |
San Diego |
2,180 |
Tijuana River Valley Invasive Plant Control Plan
|
Completed |
San Diego |
< 0.1 |
Topanga Creek and Lagoon Restoration Program
|
Completed |
Los Angeles |
30.00 |
Topanga Lagoon and Watershed Restoration
|
Completed |
Los Angeles |
< 0.1 |
Topanga Lagoon Restoration Planning Phase 1
Map
|
Planning |
Los Angeles |
41.00 |
Trabuco Creek Fish Passage Project at the Metrolink and I-5 Bridges
Map
|
Planning |
Orange |
25.00 |
Trancas Creek Flood Control Channel Restoration Planning Project
Map
|
Planning |
Los Angeles |
5.50 |
Trancas Creek Lagoon Restoration Planning Project
Map
|
Planning |
Los Angeles |
7.00 |
Tuna Canyon SEA Acquisition
Map
|
Completed |
Los Angeles |
417.0 |
Upper Devereux Slough Restoration Implementation
Map
|
In-progress |
Santa Barbara |
136.0 |
Upper Los Angeles River Watershed Arundo Eradication Program
Map
|
In-progress |
Los Angeles |
80.00 |
Upper Newport Bay and Alamitos Bay Living Shoreline Project
Map
|
In-progress |
Los Angeles, Orange |
< 0.1 |
Upper Newport Bay Ecological Restoration Implementation
Map
|
Completed |
Orange |
1,000 |
Upper Sulpher Creek Restoration
Map
|
Completed |
Orange |
5.10 |
Upper Zuniga Road Acquisition
Map
|
Completed |
Los Angeles |
120.0 |
Ventura River Arundo Removal Project
Map
|
Completed |
Ventura |
5.17 |
Western Goleta Slough Wetland Restoration
Map
|
Completed |
Santa Barbara |
34.41 |
Zuma Canyon Restoration and Steelhead Enhancement
Map
|
Completed |
Los Angeles |
6.00 |